Automated planning of concrete joint layouts with 4D-BIM

Automated planning of concrete joint layouts with 4D-BIM

Sheikhkhoshkar, Moslem ORCID logoORCID: https://orcid.org/0000-0001-9067-2705, Pour Rahimian, Farzad, Kaveh, Mohammad Hossein, Hosseini, M. Reza and Edwards, David J. (2019) Automated planning of concrete joint layouts with 4D-BIM. Automation in Construction, 107:102943. ISSN 0926-5805 (Print), 1872-7891 (Online) (doi:10.1016/j.autcon.2019.102943)

[thumbnail of Author's Accepted Manuscript]
Preview
PDF (Author's Accepted Manuscript)
50073 SHEIKHKHOSHKAR_Automated_Planning_Of_Concrete_Joint_Layouts_With_4D-BIM_(AAM)_2019.pdf - Accepted Version
Available under License Creative Commons Attribution Non-commercial No Derivatives.

Download (2MB) | Preview

Abstract

Concrete pouring represents a major critical path activity that is often affected by design limitations, structural considerations and on-site operational constraints. As such, meticulous planning is required to ensure that both the aesthetic and structural integrity of joints between cast in-situ components is achieved. Failure to adequately plan concrete pouring could lead to structural defects, construction rework or structural instability, all having major financial implications. Given the inherent complexity of large-scale construction projects, the ‘manual planning’ of concrete pouring is a challenging task and prone to human errors. Against this backdrop, this study developed 4D Building Information Management (BIM) approach to facilitate automated concrete joint positioning solution (as a proof of concept) for design professionals and contractors. The study first developed structural model in Revit, then extracted spatial information regarding all construction joints and linked them to dynamic Microsoft (MS) Excel and Matlab spreadsheets using integration facilitated by Dynamo software. Midspan points of each beam as well as floor perimeter information were gathered via codes developed in MS Excel macros. Based on the Excel outputs, Matlab programming was used to determine best concreating starting points and directions, and daily allowed concrete volume, considering limitations due to cold joints. These information were then pushed back to Revit via Dynamo in order to develop daily concrete scheduling. The developed automated programme framework offers a cost-effective and accurate methodology to address the limitations and inefficiencies of traditional methods of designing construction joints and planning pours. This framework extends the body of knowledge by introducing innovative solutions to integrate structural design considerations, constructional procedures and operational aspects for mitigating human error, and providing a novel, yet technically sound, basis for further application of BIM in structural engineering.

Item Type: Article
Uncontrolled Keywords: digital engineering, structural engineers, integrated concrete design, concrete scheduling, 4D BIM, optimisation
Subjects: N Fine Arts > NC Drawing Design Illustration
Q Science > QA Mathematics > QA75 Electronic computers. Computer science
T Technology > T Technology (General)
Faculty / School / Research Centre / Research Group: Faculty of Engineering & Science
Faculty of Engineering & Science > School of Engineering (ENG)
Last Modified: 26 Mar 2025 16:19
URI: http://gala.gre.ac.uk/id/eprint/50073

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year

View more statistics