Identifying capacity building needs for the cassava sector: a workshop with equipment manufacturers, food processors and service providers
Tools
Precoppe, Marcelo ORCID: 0000-0002-7937-5782 (2020) Identifying capacity building needs for the cassava sector: a workshop with equipment manufacturers, food processors and service providers. Project Report. Natural Resources Insitute, University of Greenwich, London, University of Greenwich. (Unpublished)
|
PDF (Author's report)
34851_PRECOPPE_Capacity_building_on_energy_performance.pdf - Accepted Version Download (499kB) | Preview |
Abstract
To identify the capacity building needs for the cassava sector, a workshop was organized in Abeokuta. Manufacturers of processing equipm ent, cassava processors and service providers were invited. A total of 24 participants attended the workshop, their details can be found in Appendix 1.
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | capacity building |
Subjects: | S Agriculture > S Agriculture (General) T Technology > TJ Mechanical engineering and machinery |
Faculty / School / Research Centre / Research Group: | Faculty of Engineering & Science Faculty of Engineering & Science > Natural Resources Institute Faculty of Engineering & Science > Natural Resources Institute > Food & Markets Department |
Last Modified: | 29 Jan 2022 12:44 |
URI: | http://gala.gre.ac.uk/id/eprint/34851 |
Actions (login required)
View Item |
Downloads
Downloads per month over past year
Altmetric