Browse by Journal Title
Up a level |
Article
Chen, Bo, Glass, Celia A., Potts, Chris N. and Strusevich, Vitaly A. (1996) A new heuristic for three-machine flow shop scheduling. Operations Research, 44 (6). pp. 891-898. ISSN 0030-364X (Print), 1526-5463 (Online) (doi:https://doi.org/10.1287/opre.44.6.891)
Kubzin, M.A. and Strusevich, V.A. (2006) Planning machine maintenance in two-machine shop scheduling. Operations Research, 54 (4). pp. 789-800. ISSN 0030-364X (Print), 1526-5463 (Online) (doi:https://doi.org/10.1287/opre.1060.0301)
Rustogi, Kabir and Strusevich, Vitaly A. (2013) Parallel machine scheduling: Impact of adding extra machines. Operations Research, 61 (5). pp. 1243-1257. ISSN 0030-364X (Print), 1526-5463 (Online) (doi:https://doi.org/10.1287/opre.2013.1208)
Walshaw, Chris ORCID: 0000-0003-0253-7779 (2002) A multilevel approach to the travelling salesman problem. Operations Research, 50 (5). pp. 862-877. ISSN 0030-364X (Print), 1526-5463 (Online) (doi:https://doi.org/10.1287/opre.50.5.862.373)