Skip navigation

Browse by Journal Title

Browse by Journal Title

Jump to: C | K | R | W
Number of items: 4.

C

Chen, Bo, Glass, Celia A., Potts, Chris N. and Strusevich, Vitaly A. (1996) A new heuristic for three-machine flow shop scheduling. Operations Research, 44 (6). pp. 891-898. ISSN 0030-364X (Print), 1526-5463 (Online) (doi:10.1287/opre.44.6.891)

K

Kubzin, M.A. and Strusevich, V.A. (2006) Planning machine maintenance in two-machine shop scheduling. Operations Research, 54 (4). pp. 789-800. ISSN 0030-364X (Print), 1526-5463 (Online) (doi:10.1287/opre.1060.0301)

R

Rustogi, Kabir and Strusevich, Vitaly A. (2013) Parallel machine scheduling: Impact of adding extra machines. Operations Research, 61 (5). pp. 1243-1257. ISSN 0030-364X (Print), 1526-5463 (Online) (doi:10.1287/opre.2013.1208)

W

Walshaw, Chris ORCID logoORCID: https://orcid.org/0000-0003-0253-7779 (2002) A multilevel approach to the travelling salesman problem. Operations Research, 50 (5). pp. 862-877. ISSN 0030-364X (Print), 1526-5463 (Online) (doi:10.1287/opre.50.5.862.373)

This list was generated on Fri Dec 20 23:31:54 2024 UTC.