Skip navigation

Items where Author is "Schmidt, Günter"

Items where Author is "Schmidt, Günter"

Up a level
Export as [feed] RSS
Group by: Item Type | Uncontrolled Keywords | No Grouping
Number of items: 3.

availability constraints

Breit, Joachim, Schmidt, Günter and Strusevich, Vitaly A. (2001) Two-machine open shop scheduling with an availability constraint. Operations Research Letters, 29 (2). pp. 65-77. ISSN 0167-6377 (doi:https://doi.org/10.1016/S0167-6377(01)00079-7)

open shop scheduling

Breit, Joachim, Schmidt, Günter and Strusevich, Vitaly A. (2001) Two-machine open shop scheduling with an availability constraint. Operations Research Letters, 29 (2). pp. 65-77. ISSN 0167-6377 (doi:https://doi.org/10.1016/S0167-6377(01)00079-7)

worst-case analysis

Breit, Joachim, Schmidt, Günter and Strusevich, Vitaly A. (2001) Two-machine open shop scheduling with an availability constraint. Operations Research Letters, 29 (2). pp. 65-77. ISSN 0167-6377 (doi:https://doi.org/10.1016/S0167-6377(01)00079-7)

This list was generated on Tue Apr 30 23:50:18 2024 UTC.