Browse by Journal Title
Up a level |
Article
Blazewicz, Jacek, Burke, Edumnd K., Gordon, Valery S., Kovalyov, Mikhail Y., Shafransky, Yakov M. and Strusevich, Vitaly A. (2011) Editorial: new branches, old roots. Journal of Scheduling, 15 (4). pp. 399-401. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-011-0262-9)
Cheng, T.C. Edwin and Shakhlevich, Natalia (1999) Proportionate flow shop with controllable processing times. Journal of Scheduling, 2 (6). pp. 253-265. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1002/(SICI)1099-1425(199911/12)2:6<253::AID-JOS30>3.0.CO;2-R)
Gordon, V.S., Kovalyov, M.Y., Levin, G.M., Shafransky, Y.M., Sotskov, Y.N., Strusevich, V.A. and Tuzikov, A.V. (2011) Vyacheslav Tanaev: contributions to scheduling and related areas. Journal of Scheduling, 15 (4). pp. 403-418. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-011-0230-4)
Gordon, V.S., Potts, C.N., Strusevich, V.A. and Whitehead, J.D. (2008) Single machine scheduling models with deterioration and learning: handling precedence constraints via priority generation. Journal of Scheduling, 11 (5). pp. 357-370. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-008-0064-x)
Gordon, Valerie, Strusevich, Vitaly and Dolgui, Alexandre (2011) Scheduling with due date assignment under special conditions on job processing. Journal of Scheduling, 15 (4). pp. 447-456. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-011-0240-2)
Kellerer, Hans, Rustogi, Kabir and Strusevich, Vitaly A. (2012) Approximation schemes for scheduling on a single machine subject to cumulative deterioration and maintenance. Journal of Scheduling, 16 (6). pp. 675-683. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-012-0287-8)
Potts, C.N., Strusevich, V.A. and Tautenhahn, T. (2001) Scheduling batches with simultaneous job processing for two-machine shop problems. Journal of Scheduling, 4 (1). pp. 25-51. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1002/1099-1425(200101/02)4:1<25::AID-JOS58>3.0.CO;2-7)
Rustogi, Kabir and Strusevich, Vitaly A. (2016) Single machine scheduling with a generalized job-dependent cumulative effect. Journal of Scheduling, 20 (6). pp. 583-592. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-016-0497-6)
Shakhlevich, Natalia, Hoogeveen, Han and Pinedo, Michael (1998) Minimizing total weighted completion time in a proportionate flow shop. Journal of Scheduling, 1 (3). pp. 157-168. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1002/(SICI)1099-1425(1998100)1:3<157::AID-JOS12>3.0.CO;2-Y)
Shakhlevich, Natalia V. and Strusevich, Vitaly A. (2005) Pre-emptive scheduling problems with controllable processing times. Journal of Scheduling, 8 (3). pp. 233-253. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-005-6813-1)
Soper, Alan ORCID: 0000-0002-0901-9803 and Strusevich, Vitaly (2022) Preemptive and non-preemptive scheduling on two unrelated parallel machines. Journal of Scheduling, 2022. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-022-00753-7)
Soper, Alan J. ORCID: 0000-0002-0901-9803 (2015) A cyclical search for the two machine flow shop and open shop to minimise finishing time. Journal of Scheduling, 18 (3). pp. 311-314. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-013-0356-7)
Soper, Alan J. ORCID: 0000-0002-0901-9803 and Strusevich, Vitaly (2019) Refined conditions for V-shaped optimal sequencing on a single machine to minimize total completion time under combined effects. Journal of Scheduling, 23 (6). pp. 665-680. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-019-00628-4)