Items where Author is "Hamzeh, Farook"
common scheduling methods
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2023)
Functionality as a key concept for integrated project planning and scheduling methods.
Journal of Construction Engineering and Management, 149 (7).
ISSN 0733-9364 (Print), 1943-7862 (Online)
(doi:10.1061/JCEMD4.COENG-13427)
control metrics
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2024)
An advanced exploration of functionalities as the underlying principles of construction control metrics.
Smart and Sustainable Built Environment (SASBE), 13 (3).
pp. 644-676.
ISSN 2046-6099 (Print), 2046-6102 (Online)
(doi:10.1108/SASBE-12-2023-0379)
decision support system
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, El-Haouzi, Hind Bril, Aubry, Alexis, Hamzeh, Farook and Rahimian, Farzad
(2025)
A data-driven and knowledge-based decision support system for optimized construction planning and control.
Automation in Construction, 173:106066.
ISSN 0926-5805 (Print), 1872-7891 (Online)
(doi:10.1016/j.autcon.2025.106066)
Design Science Research (DSR)
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Sakikhales, Mohammad
(2024)
An innovative integrated framework for multi-level production planning and control systems in construction.
Developments in the Built Environment (DIBE), 19:100524.
ISSN 2666-1659 (Online)
(doi:10.1016/j.dibe.2024.100524)
functionalities
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Rahimian, Farzad
(2024)
From process-based to technology-driven: a study on functionalities as key elements of collaborative planning methods for construction projects.
Production Planning and Control.
ISSN 0953-7287 (Print), 1366-5871 (Online)
(doi:10.1080/09537287.2024.2360581)
functionality
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2024)
An advanced exploration of functionalities as the underlying principles of construction control metrics.
Smart and Sustainable Built Environment (SASBE), 13 (3).
pp. 644-676.
ISSN 2046-6099 (Print), 2046-6102 (Online)
(doi:10.1108/SASBE-12-2023-0379)
functionality concept
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Sakikhales, Mohammad
(2024)
An innovative integrated framework for multi-level production planning and control systems in construction.
Developments in the Built Environment (DIBE), 19:100524.
ISSN 2666-1659 (Online)
(doi:10.1016/j.dibe.2024.100524)
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2023)
Functionality as a key concept for integrated project planning and scheduling methods.
Journal of Construction Engineering and Management, 149 (7).
ISSN 0733-9364 (Print), 1943-7862 (Online)
(doi:10.1061/JCEMD4.COENG-13427)
functionality concepts
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, El Haouzi, Hind Bril, Aubry, Alexis
ORCID: https://orcid.org/0000-0001-9067-2705, Hamzeh, Farook and Rahimian, Farzad
(2024)
From NLP to taxonomy: identifying and classifying key functionality concepts of multi-level project planning and control systems.
Journal of Information Technology in Construction (ITcon), 29.
pp. 1200-1218.
ISSN 1874-4753 (Online)
(doi:10.36680/j.itcon.2024.053)
integrated scheduling methods
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Poshdar, Mani
(2023)
Analyzing the lean principles in integrated planning and scheduling methods.
In: Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31).
IGLC
(31).
Centrale Lille Institute and Institut Français de la Construction Lean (IFCL), Lille, France, pp. 1196-1207.
ISBN 978-8269249941
ISSN 2309-0979 (Print), 2789-0015 (Online)
(doi:10.24928/2023/0159)
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2023)
Functionality as a key concept for integrated project planning and scheduling methods.
Journal of Construction Engineering and Management, 149 (7).
ISSN 0733-9364 (Print), 1943-7862 (Online)
(doi:10.1061/JCEMD4.COENG-13427)
knowledge repository
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, El-Haouzi, Hind Bril, Aubry, Alexis, Hamzeh, Farook and Rahimian, Farzad
(2025)
A data-driven and knowledge-based decision support system for optimized construction planning and control.
Automation in Construction, 173:106066.
ISSN 0926-5805 (Print), 1872-7891 (Online)
(doi:10.1016/j.autcon.2025.106066)
lean construction
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2024)
An advanced exploration of functionalities as the underlying principles of construction control metrics.
Smart and Sustainable Built Environment (SASBE), 13 (3).
pp. 644-676.
ISSN 2046-6099 (Print), 2046-6102 (Online)
(doi:10.1108/SASBE-12-2023-0379)
lean principles
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Poshdar, Mani
(2023)
Analyzing the lean principles in integrated planning and scheduling methods.
In: Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31).
IGLC
(31).
Centrale Lille Institute and Institut Français de la Construction Lean (IFCL), Lille, France, pp. 1196-1207.
ISBN 978-8269249941
ISSN 2309-0979 (Print), 2789-0015 (Online)
(doi:10.24928/2023/0159)
mathematical model
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, El-Haouzi, Hind Bril, Aubry, Alexis, Hamzeh, Farook and Rahimian, Farzad
(2025)
A data-driven and knowledge-based decision support system for optimized construction planning and control.
Automation in Construction, 173:106066.
ISSN 0926-5805 (Print), 1872-7891 (Online)
(doi:10.1016/j.autcon.2025.106066)
multi-level framework
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Sakikhales, Mohammad
(2024)
An innovative integrated framework for multi-level production planning and control systems in construction.
Developments in the Built Environment (DIBE), 19:100524.
ISSN 2666-1659 (Online)
(doi:10.1016/j.dibe.2024.100524)
multi-objective optimization model
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Sakikhales, Mohammad
(2024)
An innovative integrated framework for multi-level production planning and control systems in construction.
Developments in the Built Environment (DIBE), 19:100524.
ISSN 2666-1659 (Online)
(doi:10.1016/j.dibe.2024.100524)
Natural Language Processing (NLP)
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, El Haouzi, Hind Bril, Aubry, Alexis
ORCID: https://orcid.org/0000-0001-9067-2705, Hamzeh, Farook and Rahimian, Farzad
(2024)
From NLP to taxonomy: identifying and classifying key functionality concepts of multi-level project planning and control systems.
Journal of Information Technology in Construction (ITcon), 29.
pp. 1200-1218.
ISSN 1874-4753 (Online)
(doi:10.36680/j.itcon.2024.053)
Pareto chart analysis
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2023)
Functionality as a key concept for integrated project planning and scheduling methods.
Journal of Construction Engineering and Management, 149 (7).
ISSN 0733-9364 (Print), 1943-7862 (Online)
(doi:10.1061/JCEMD4.COENG-13427)
planning and control system
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, El-Haouzi, Hind Bril, Aubry, Alexis, Hamzeh, Farook and Rahimian, Farzad
(2025)
A data-driven and knowledge-based decision support system for optimized construction planning and control.
Automation in Construction, 173:106066.
ISSN 0926-5805 (Print), 1872-7891 (Online)
(doi:10.1016/j.autcon.2025.106066)
planning and control systems
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, El Haouzi, Hind Bril, Aubry, Alexis
ORCID: https://orcid.org/0000-0001-9067-2705, Hamzeh, Farook and Rahimian, Farzad
(2024)
From NLP to taxonomy: identifying and classifying key functionality concepts of multi-level project planning and control systems.
Journal of Information Technology in Construction (ITcon), 29.
pp. 1200-1218.
ISSN 1874-4753 (Online)
(doi:10.36680/j.itcon.2024.053)
process-based collaborative planning
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Rahimian, Farzad
(2024)
From process-based to technology-driven: a study on functionalities as key elements of collaborative planning methods for construction projects.
Production Planning and Control.
ISSN 0953-7287 (Print), 1366-5871 (Online)
(doi:10.1080/09537287.2024.2360581)
production control
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2024)
An advanced exploration of functionalities as the underlying principles of construction control metrics.
Smart and Sustainable Built Environment (SASBE), 13 (3).
pp. 644-676.
ISSN 2046-6099 (Print), 2046-6102 (Online)
(doi:10.1108/SASBE-12-2023-0379)
production planning and control
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Sakikhales, Mohammad
(2024)
An innovative integrated framework for multi-level production planning and control systems in construction.
Developments in the Built Environment (DIBE), 19:100524.
ISSN 2666-1659 (Online)
(doi:10.1016/j.dibe.2024.100524)
project planning
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2024)
An advanced exploration of functionalities as the underlying principles of construction control metrics.
Smart and Sustainable Built Environment (SASBE), 13 (3).
pp. 644-676.
ISSN 2046-6099 (Print), 2046-6102 (Online)
(doi:10.1108/SASBE-12-2023-0379)
quantitative analysis
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Poshdar, Mani
(2023)
Analyzing the lean principles in integrated planning and scheduling methods.
In: Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31).
IGLC
(31).
Centrale Lille Institute and Institut Français de la Construction Lean (IFCL), Lille, France, pp. 1196-1207.
ISBN 978-8269249941
ISSN 2309-0979 (Print), 2789-0015 (Online)
(doi:10.24928/2023/0159)
rough set theory
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, El-Haouzi, Hind Bril, Aubry, Alexis, Hamzeh, Farook and Rahimian, Farzad
(2025)
A data-driven and knowledge-based decision support system for optimized construction planning and control.
Automation in Construction, 173:106066.
ISSN 0926-5805 (Print), 1872-7891 (Online)
(doi:10.1016/j.autcon.2025.106066)
SBERT
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, El Haouzi, Hind Bril, Aubry, Alexis
ORCID: https://orcid.org/0000-0001-9067-2705, Hamzeh, Farook and Rahimian, Farzad
(2024)
From NLP to taxonomy: identifying and classifying key functionality concepts of multi-level project planning and control systems.
Journal of Information Technology in Construction (ITcon), 29.
pp. 1200-1218.
ISSN 1874-4753 (Online)
(doi:10.36680/j.itcon.2024.053)
SNA
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Rahimian, Farzad
(2024)
From process-based to technology-driven: a study on functionalities as key elements of collaborative planning methods for construction projects.
Production Planning and Control.
ISSN 0953-7287 (Print), 1366-5871 (Online)
(doi:10.1080/09537287.2024.2360581)
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Poshdar, Mani
(2023)
Analyzing the lean principles in integrated planning and scheduling methods.
In: Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31).
IGLC
(31).
Centrale Lille Institute and Institut Français de la Construction Lean (IFCL), Lille, France, pp. 1196-1207.
ISBN 978-8269249941
ISSN 2309-0979 (Print), 2789-0015 (Online)
(doi:10.24928/2023/0159)
Social Network Analysis (SNA)
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2024)
An advanced exploration of functionalities as the underlying principles of construction control metrics.
Smart and Sustainable Built Environment (SASBE), 13 (3).
pp. 644-676.
ISSN 2046-6099 (Print), 2046-6102 (Online)
(doi:10.1108/SASBE-12-2023-0379)
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis and Hamzeh, Farook
(2023)
Functionality as a key concept for integrated project planning and scheduling methods.
Journal of Construction Engineering and Management, 149 (7).
ISSN 0733-9364 (Print), 1943-7862 (Online)
(doi:10.1061/JCEMD4.COENG-13427)
taxonomy
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, El Haouzi, Hind Bril, Aubry, Alexis
ORCID: https://orcid.org/0000-0001-9067-2705, Hamzeh, Farook and Rahimian, Farzad
(2024)
From NLP to taxonomy: identifying and classifying key functionality concepts of multi-level project planning and control systems.
Journal of Information Technology in Construction (ITcon), 29.
pp. 1200-1218.
ISSN 1874-4753 (Online)
(doi:10.36680/j.itcon.2024.053)
technology-driven collaborative planning
Sheikhkhoshkar, Moslem ORCID: https://orcid.org/0000-0001-9067-2705, Bril El-Haouzi, Hind, Aubry, Alexis, Hamzeh, Farook and Rahimian, Farzad
(2024)
From process-based to technology-driven: a study on functionalities as key elements of collaborative planning methods for construction projects.
Production Planning and Control.
ISSN 0953-7287 (Print), 1366-5871 (Online)
(doi:10.1080/09537287.2024.2360581)