Items where Author is "Dolgui, Alexandre"
Up a level |
analytic approximations
Potts, Chris N., Strusevich, Vitaly A. and Whitehead, Jonathan D. (2006) On-line algorithms for single machine scheduling with family setup times. In: 12th IFAC Symposium on Information Control Problems in Manufacturing, 2006 [Proceedings]. Information Control Problems in Manufacturing (12:1). International Federation of Automatic Control, Laxenburg, Austria, pp. 135-141. ISBN 9783902661043 (doi:https://doi.org/10.3182/20060517-3-FR-2903.00084)
automation
Soper, Alan ORCID: 0000-0002-0901-9803 and Strusevich, Vitaly A. (2006) Two-machine flow shop scheduling with an interstage transporter: two shipments. In: Dolgui, Alexandre, Morel, Gerard and Pereira, Carlos Eduardo, (eds.) Information Control Problems in Manufacturing 2006: A Proceedings volume from the 12th IFAC International Symposium, St Etienne, France, 17-19 May 2006. IFAC Proceedings Volumes, 3 . Elsevier Ltd., Oxford, UK, pp. 27-32. ISBN 978-0-08-044654-7
batch
Potts, Chris N., Strusevich, Vitaly A. and Whitehead, Jonathan D. (2006) On-line algorithms for single machine scheduling with family setup times. In: 12th IFAC Symposium on Information Control Problems in Manufacturing, 2006 [Proceedings]. Information Control Problems in Manufacturing (12:1). International Federation of Automatic Control, Laxenburg, Austria, pp. 135-141. ISBN 9783902661043 (doi:https://doi.org/10.3182/20060517-3-FR-2903.00084)
classical deterministic scheduling models
Gordon, Valery, Dolgui, Alexandre and Strusevich, Vitaly (2009) Due date assignment and scheduling under special conditions on job processing. In: Information Control Problems in Manufacturing. International Federation of Automatic Control (IFAC) / Elsevier. ISBN 978-3-902661-43-2 ISSN 1474-6670 (doi:https://doi.org/10.3182/20090603-3-RU-2001.00086)
deterioration
Dolgui, Alexandre, Gordon, Valery and Strusevich, Vitaly (2012) Single machine scheduling with precedence constraints and positionally dependent processing times. Computers and Operations Research, 39 (6). pp. 1218-1224. ISSN 0305-0548 (doi:https://doi.org/10.1016/j.cor.2010.06.004)
Gordon, Valerie, Strusevich, Vitaly and Dolgui, Alexandre (2011) Scheduling with due date assignment under special conditions on job processing. Journal of Scheduling, 15 (4). pp. 447-456. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-011-0240-2)
Dolgui, Alexandre, Gordon, Valery and Strusevich, Vitaly (2010) Single machine scheduling with precedence constraints and positionally dependent processing times. Computers & Operations Research, 39 (6). pp. 1218-1224. ISSN 0305-0548 (doi:https://doi.org/10.1016/j.cor.2010.06.004)
due date assignment
Gordon, Valerie, Strusevich, Vitaly and Dolgui, Alexandre (2011) Scheduling with due date assignment under special conditions on job processing. Journal of Scheduling, 15 (4). pp. 447-456. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-011-0240-2)
Gordon, Valery, Dolgui, Alexandre and Strusevich, Vitaly (2009) Due date assignment and scheduling under special conditions on job processing. In: Information Control Problems in Manufacturing. International Federation of Automatic Control (IFAC) / Elsevier. ISBN 978-3-902661-43-2 ISSN 1474-6670 (doi:https://doi.org/10.3182/20090603-3-RU-2001.00086)
IT
Soper, Alan ORCID: 0000-0002-0901-9803 and Strusevich, Vitaly A. (2006) Two-machine flow shop scheduling with an interstage transporter: two shipments. In: Dolgui, Alexandre, Morel, Gerard and Pereira, Carlos Eduardo, (eds.) Information Control Problems in Manufacturing 2006: A Proceedings volume from the 12th IFAC International Symposium, St Etienne, France, 17-19 May 2006. IFAC Proceedings Volumes, 3 . Elsevier Ltd., Oxford, UK, pp. 27-32. ISBN 978-0-08-044654-7
learning
Dolgui, Alexandre, Gordon, Valery and Strusevich, Vitaly (2012) Single machine scheduling with precedence constraints and positionally dependent processing times. Computers and Operations Research, 39 (6). pp. 1218-1224. ISSN 0305-0548 (doi:https://doi.org/10.1016/j.cor.2010.06.004)
Gordon, Valerie, Strusevich, Vitaly and Dolgui, Alexandre (2011) Scheduling with due date assignment under special conditions on job processing. Journal of Scheduling, 15 (4). pp. 447-456. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-011-0240-2)
Dolgui, Alexandre, Gordon, Valery and Strusevich, Vitaly (2010) Single machine scheduling with precedence constraints and positionally dependent processing times. Computers & Operations Research, 39 (6). pp. 1218-1224. ISSN 0305-0548 (doi:https://doi.org/10.1016/j.cor.2010.06.004)
maintenance activity
Gordon, Valerie, Strusevich, Vitaly and Dolgui, Alexandre (2011) Scheduling with due date assignment under special conditions on job processing. Journal of Scheduling, 15 (4). pp. 447-456. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-011-0240-2)
manufacturing plant control
Soper, Alan ORCID: 0000-0002-0901-9803 and Strusevich, Vitaly A. (2006) Two-machine flow shop scheduling with an interstage transporter: two shipments. In: Dolgui, Alexandre, Morel, Gerard and Pereira, Carlos Eduardo, (eds.) Information Control Problems in Manufacturing 2006: A Proceedings volume from the 12th IFAC International Symposium, St Etienne, France, 17-19 May 2006. IFAC Proceedings Volumes, 3 . Elsevier Ltd., Oxford, UK, pp. 27-32. ISBN 978-0-08-044654-7
marketing
Gordon, Valery, Dolgui, Alexandre and Strusevich, Vitaly (2009) Due date assignment and scheduling under special conditions on job processing. In: Information Control Problems in Manufacturing. International Federation of Automatic Control (IFAC) / Elsevier. ISBN 978-3-902661-43-2 ISSN 1474-6670 (doi:https://doi.org/10.3182/20090603-3-RU-2001.00086)
on-line
Potts, Chris N., Strusevich, Vitaly A. and Whitehead, Jonathan D. (2006) On-line algorithms for single machine scheduling with family setup times. In: 12th IFAC Symposium on Information Control Problems in Manufacturing, 2006 [Proceedings]. Information Control Problems in Manufacturing (12:1). International Federation of Automatic Control, Laxenburg, Austria, pp. 135-141. ISBN 9783902661043 (doi:https://doi.org/10.3182/20060517-3-FR-2903.00084)
optimal sequencing
Gordon, Valery, Dolgui, Alexandre and Strusevich, Vitaly (2009) Due date assignment and scheduling under special conditions on job processing. In: Information Control Problems in Manufacturing. International Federation of Automatic Control (IFAC) / Elsevier. ISBN 978-3-902661-43-2 ISSN 1474-6670 (doi:https://doi.org/10.3182/20090603-3-RU-2001.00086)
positionally dependent processing time
Dolgui, Alexandre, Gordon, Valery and Strusevich, Vitaly (2012) Single machine scheduling with precedence constraints and positionally dependent processing times. Computers and Operations Research, 39 (6). pp. 1218-1224. ISSN 0305-0548 (doi:https://doi.org/10.1016/j.cor.2010.06.004)
Dolgui, Alexandre, Gordon, Valery and Strusevich, Vitaly (2010) Single machine scheduling with precedence constraints and positionally dependent processing times. Computers & Operations Research, 39 (6). pp. 1218-1224. ISSN 0305-0548 (doi:https://doi.org/10.1016/j.cor.2010.06.004)
precedence constraints
Dolgui, Alexandre, Gordon, Valery and Strusevich, Vitaly (2012) Single machine scheduling with precedence constraints and positionally dependent processing times. Computers and Operations Research, 39 (6). pp. 1218-1224. ISSN 0305-0548 (doi:https://doi.org/10.1016/j.cor.2010.06.004)
Gordon, Valerie, Strusevich, Vitaly and Dolgui, Alexandre (2011) Scheduling with due date assignment under special conditions on job processing. Journal of Scheduling, 15 (4). pp. 447-456. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-011-0240-2)
Dolgui, Alexandre, Gordon, Valery and Strusevich, Vitaly (2010) Single machine scheduling with precedence constraints and positionally dependent processing times. Computers & Operations Research, 39 (6). pp. 1218-1224. ISSN 0305-0548 (doi:https://doi.org/10.1016/j.cor.2010.06.004)
Gordon, Valery, Dolgui, Alexandre and Strusevich, Vitaly (2009) Due date assignment and scheduling under special conditions on job processing. In: Information Control Problems in Manufacturing. International Federation of Automatic Control (IFAC) / Elsevier. ISBN 978-3-902661-43-2 ISSN 1474-6670 (doi:https://doi.org/10.3182/20090603-3-RU-2001.00086)
scheduling
Dolgui, Alexandre, Gordon, Valery and Strusevich, Vitaly (2012) Single machine scheduling with precedence constraints and positionally dependent processing times. Computers and Operations Research, 39 (6). pp. 1218-1224. ISSN 0305-0548 (doi:https://doi.org/10.1016/j.cor.2010.06.004)
Gordon, Valerie, Strusevich, Vitaly and Dolgui, Alexandre (2011) Scheduling with due date assignment under special conditions on job processing. Journal of Scheduling, 15 (4). pp. 447-456. ISSN 1094-6136 (Print), 1099-1425 (Online) (doi:https://doi.org/10.1007/s10951-011-0240-2)
Dolgui, Alexandre, Gordon, Valery and Strusevich, Vitaly (2010) Single machine scheduling with precedence constraints and positionally dependent processing times. Computers & Operations Research, 39 (6). pp. 1218-1224. ISSN 0305-0548 (doi:https://doi.org/10.1016/j.cor.2010.06.004)
scheduling algorithms
Potts, Chris N., Strusevich, Vitaly A. and Whitehead, Jonathan D. (2006) On-line algorithms for single machine scheduling with family setup times. In: 12th IFAC Symposium on Information Control Problems in Manufacturing, 2006 [Proceedings]. Information Control Problems in Manufacturing (12:1). International Federation of Automatic Control, Laxenburg, Austria, pp. 135-141. ISBN 9783902661043 (doi:https://doi.org/10.3182/20060517-3-FR-2903.00084)
scheduling problems
Gordon, Valery, Dolgui, Alexandre and Strusevich, Vitaly (2009) Due date assignment and scheduling under special conditions on job processing. In: Information Control Problems in Manufacturing. International Federation of Automatic Control (IFAC) / Elsevier. ISBN 978-3-902661-43-2 ISSN 1474-6670 (doi:https://doi.org/10.3182/20090603-3-RU-2001.00086)
technological
Gordon, Valery, Dolgui, Alexandre and Strusevich, Vitaly (2009) Due date assignment and scheduling under special conditions on job processing. In: Information Control Problems in Manufacturing. International Federation of Automatic Control (IFAC) / Elsevier. ISBN 978-3-902661-43-2 ISSN 1474-6670 (doi:https://doi.org/10.3182/20090603-3-RU-2001.00086)